All Legislation
Motion23-0370Adopted
A motion requesting that the Department of Engineering, Division of Traffic and Signals, perform a traffic study assessment at Grafton Avenue and Parker Street to determine if a four-way stop sign is warranted; furthermore, requesting that the traffic light located at 3rd Avenue and Summer Street is inspected to determine if the height of the traffic signal needs to be adjusted.
Progress
✓
Introduced
Mar 3, 2023
✓
In Committee
Feb 1, 2023
✓
Passed
Feb 1, 2023
4
Enacted